YEAR
|
PROJECT DESCRIPTION
|
CLIENT
|
May 2015
|
Provision of Consultancy Services for rating valuation of properties located within the eight (8) urban local government authorities under the Tanzania Strategic Cities Project (TSCP) – Lot 2: Tanga City Council “Joint Venture”
|
Prime Minister Office, Regional Administration and Local Government, under Tanzania Strategic Cities Project (TSCP)
|
Jan 2015
|
Provision of boundary recovery and topographical survey of plot number 1010 Buguruni (Msimbazi valley - from Mandela Road to Kawawa Road bridge), Ilala Municipality
|
CRJE on behalf of Jitegemee Trading Company Limited
|
Febr.2013
|
Provision of Consultancy Services for Collecting Core Data of Properties in the Seven Participating LGA’s Lot No.4 (Dodoma Municipal & Kigoma/Ujiji Municipal).
|
Tanzania Strategic Cities Project (TSCP) – Prime Minister’s Office (PMO).
|
Jan.2013
|
Provision of Land Surveying Services, Demarcation of Plots and Topographical Mapping at Kondo Village Bagamoyo District.
|
Institute of African Leadership for Sustainable Development - Uongozi Institute
|
Dec. 2012
|
Provision of Consultancy Services for Collecting Core Data of Properties in the Seven Participating LGA’s Lot No.2 (Tanga & Mwanza Cities).
|
Tanzania Strategic Cities Project (TSCP) – Prime Minister’s Office (PMO).
|
Sept. 2012
|
Topographic Survey of Railway line from Ubungo Maziwa to City Centre – Dar City
|
RAHCO
|
Nov.2011-Jan.2012
|
Cadastral Survey of 864 plots at Gezaulole, Temeke Municipality, City of Dar es salaam.
|
Temeke Municipal Council
|
June, 2011
|
Designing of new Railway transportation system and updating of existing network system. This was done by considering spatial and non spatial network information.
|
Reli Asset Holding Company Tanzania Ltd.
|
May, 2011
|
GPS Positioning survey for Gas & Petroleum exploration well at Nyuni, Songo songo - Kilwa in Lindi Region.
|
Ndovu Resources Ltd
|
Nov.2010-Jan.211
|
Pre-design survey involving Topographical Survey of an existing Oil Pipeline from the Single Point Mooring (SPM) at Ras Mji Mwema to TIPER/TAZAMA tank farms.
|
Leighton Offshore Pte Ltd(Singapore)/TPA
|
Dec.2009-June,2010
|
Designing of the scheme of regularization and its associated land registration system for unplanned settlements of 1500 plots at Kinyambwa in Dodoma Municipal.
|
CAPITAL DEVELOPMENT DODOMA(CDA)
|
March, 2010
|
GPS Positioning for Gas & Petroleum exploration wells at Kianika, Somanga Kilwa in Lindi Region.
|
Mourel & Prom (T) Ltd
|
Dec 1,2008-April 2009
|
Topographical Surveying for Plant & Mine site(300Ha) and 60 Km roads at Kabanga, in Ngara district, Kagera region in North Western Tanzania.
|
Kabanga Nickel Company Ltd
|
Feb- April 2009
|
Preparation of Town Plan(TP) drawing and carrying out cadastral surveying of 500 plots Kange neighbourhood for Tanga City.
|
Tanga City Council
|
July 2009
|
GPS Positioning for Gas & Petroleum exploration wells at Mohoro Rufiji in Coast Region.
|
Mourel & Prom (T) Ltd
|
May-June,2009
|
Topographical surveying for 20 Km road in Mbingu Mission. Culminating in Drawing of Plan View, Profile and Cross-Sections
|
Mbingu Mission Sisters Convent
|
June, Aug. 2008
|
GPS Positioning for Gas & Petroleum wells at Mkuranga and Mafia Island in Coast region
|
Mourel & Prom (T) Ltd
|
June 2008
|
Topographical survey for Prime Minister Office site along Luthulu, Ilala central area to facilitating design works.
|
PMO(The office of Prime Minister)
|
May, 2008
|
Topographical survey for 34Ha- of proposed hotel Resort at Kizimkazi Mchangamle, Southwest Beach of Zanzibar
|
CRJE (China Railway Jiachang Engineering Company)
|
February, 2008
|
RTK GPS survey-setting out seismic lines for Mnazi Bay Gas/Oil Exploration project, in Mtwara Region.
|
Arthumas Group
|
Sept., 2007
|
Topographical route survey along High Tension line from Majani Mapana to Tanga Cement Factory to facilitate design and rehabilitation works.
|
Tanga Cement Company Limited
|
June, 2007
|
GPS survey services for SPM/MPM landed properties at Kitandililo Farm No. 928 & No.929 at Ibatu in Njombe, and Farm No.930 at Kiyowela Mufindi.
|
PSRC (Presidential Parastatal Sector Reform Commission
|
May, 2007
|
Geodetic GPS Surveying consultancy services for the appraisal of survey control points for Golden Pride Project in Nzega.
|
Resolute (T) Limited
|
Febr-March, 2007
|
Cadastral Survey of 214, 229 and 136 plots for Blocks 21, 22 and 8 respectively in Kibada Temeke Municipality
|
MLHSD (Ministry of Lands and Human Settlement Development)
|
November, 2006
|
Cadastral Survey of 474 plots within Block 8 and 10 at Lukobe area in Morogoro Municipal Council.
|
(MMC)Morogoro Municipal Council
|
August 2006
|
Cadastral Survey of 600 plots at Kibada,part of 20,000 Project , Temeke Municipality, City of Dar es salaam.
|
MLHSD (Ministry of Lands and Human Settlement Development)
|
July 2006
|
Cadastral Survey of 731 plots for Staff Housing Scheme at Bugarama & Ilogi Kahama.
|
BARRICKS TANZANIA
|
November 2005
|
Cadastral Survey of 1207 plots at Mwanza City Tanzania.
|
MCC ( Mwanza City Council)
|
April 2005
|
Cadastral Survey of 900 plots at Dodoma Ilazo North Block A, B, C, and D.
|
CDA (Capital Development Authority)
|
March 2005
|
Cadastral Survey of 600 plots at Dungu, Blocks 3, 9, and 10 at Dungu Farm Mwongozo, Temeke Municipality, City of Dar es Salaam
|
MLHSD (Ministry of Lands and Human Settlement Development)
|
July - Sept, 2004
|
Cadastral Surveying of 1089 plots within Rosylin farm in West Kilimanjaro Hai District, Kilimanjaro Region.
|
PSRC (Presidential Parastatal Sector Reform Commission)
|
March, 2004
|
Cadastral Surveying of SPM/MPM landed properties at Kalinga Farm No.610-611 and Sawala farm No. 612 and Sawala farm No. 612 and associated support services.
|
PSRC (Presidential Parastatal Sector Reform Commission
|
March, 2004
|
Detail Survey of TANESCO Ubungo turbines and housing Estate yards for Songosongo gas project.
|
Songas/CDC Globeleq
|
Nov.-Dec 2003
|
Cadastral survey of Block 4 and 5 with 800 plots as part of 20,000 plots surveyed for MLHSD at Mwanagati Ilala Dar es Salaam City.
|
MLHSD (Ministry of Lands and Human Settlements Developments)
|
November, 2003
|
Topographical Survey of the site proposed for construction of New Parliament Debating
Chamber, Dodoma.
|
The Clerk of the National Assembly.
|
October, 2003
|
Topographical Survey of 39 Acres, TCAA Head Office Transmitting plot at Ukonga Dar es salaam.
|
TCAA (Tanzania Civil Aviation Authority)
|
July, 2003
|
Cadastral survey of Block 19 with 54 plots as part of 20,000 plots surveyed for MLHSD at Buyuni Ilala Dar es Salaam City.
|
MLHSD (Ministry of Lands and Human Settlements Developments)
|
June, 2003
|
Cadastral survey of Block 17 with 300 plots as part of 20,000 plots surveyed for MLHSD at Buyuni Ilala Dar es Salaam City.
|
MLHSD (Ministry of Lands and Human Settlements Developments)
|
March, 2003
|
Cadastral survey of Block 15 with 265 plots for “Twenty Thousand plots Project” in Dar es Salaam city.
|
MLHSD (Ministry of Lands and Human Settlements Development).
|
January, 2003
|
GPS survey for Rural Electrification Project (Gas to Electricity) for distribution lines in Kilwa and Rufiji districts.
|
NORPLAN TANZANIA
|
November-December 2002
|
Resurveying and Titling of six NAFCO farms at West Kilimanjaro-10,187 Acres. Preparation of Town Plan Drawing of 925 plots for resettlement
|
PSRC (Presidential Parastatal Sector Reform Commission.)
|
November 2002
|
Staking out survey of proposed gas lines and receiving/distribution points at Ubungo Power Plant site for Songo Songo gas development.
|
SONGAS/AES
|
September 2002
|
Topographical survey of Tanzania Portland Cement factory at Wazo hill Dar es salaam for the purpose of Engineering rehabilitation.
|
Tanzania Portland Cement Company (TPCC)
P.O. Box 1950
Dar es salaam
|
July 2002
|
Topographical survey of beach front from Magogoni Ferry to Salander bridge for preliminary study of Salama Sea waterfront re-clamation project
|
Ocean Engineering,
P.O. Box 1301,
Dar es Salaam.
|
July 2002
|
Mapping of all gravesites located along the Songo songo gas pipeline Way leave
|
AES (T) Limited,
P.O Box 6342,
Dar es salaam
|
April 2002
|
As built survey of Songo songo gas pipeline wayleave in a stretch between Morogoro road and Tanesco Ubungo
|
AES (T) Limited,
P.O Box 6342,
Dar es salaam
|
March 2002
|
Boundary recovery and topographical survey of 15 hectares of farm No. 848 at Mkuzi village Lushoto District
|
IPA Architects,
DSM.
|
November 2001
|
GPS mission for positioning of Microwave mast at Songo songo island and valve station at Somanga Funga
|
AES (T) Limited,
P.O Box 6342,
Dar es salaam
|
September 2001
|
Profile survey of Songo songo gas pipeline route between Somanga Funga landfall and Kibiti – Lindi road crossing
|
AES (T) Limited,
P.O. Box 6342,
Dar es salaam
|
July 2001
|
As built survey along Tanesco wayleave - Ubungo to Mavurunza for the purpose of determining the best possible route for Songo songo gas pipeline.
|
AES (T) Limited,
P.O Box 6342,
Dar es salaam
|
May 2001
|
Map revision of Songo songo gas pipeline route from Somanga Funga landfall to Wazo hill Cement factory.
|
Songas Limited,
P.O Box 6342,
Dar es salaam
|
October 2000
|
GPS positioning survey of Drilling wells along the seismic lines at Mandawa in Kilwa District
|
Dublin International Petroleum (T) Ltd,
P.O Box 77104,Dar es salaam
|
April 2000
|
Profile survey for 55km of water supply pipeline route and production of digital data of the route profile for Moshi municipal
|
JR International BAU Gmbh
|